🇮🇪COURTS

90A.2 Order (Prohibiting Entry On Land) / (Specifying Conditions For Entry On Land) - Transport (Railway Infrastructure) Act, 2001

This form is an order under the Transport (Railway Infrastructure) Act, 2001 that either prohibits entry onto land or specifies conditions for entry on land related to railway infrastructure. It is used when there is a need to regulate access to land for railway purposes or to prevent unauthorized entry that could interfere with railway operations.

Need help? AI Editor guides you through every field of 90A.2 Order (Prohibiting Entry On Land) / (Specifying Conditions For Entry On Land) - Transport (Railway Infrastructure) Act, 2001.

Start filling →

Form Overview

90A.2 Order (Prohibiting Entry On Land) / (Specifying Conditions For Entry On Land) - Transport (Railway Infrastructure) Act, 2001

This form is an order under the Transport (Railway Infrastructure) Act, 2001 that either prohibits entry onto land or specifies conditions for entry on land related to railway infrastructure. It is used when there is a need to regulate access to land for railway purposes or to prevent unauthorized entry that could interfere with railway operations.

The form captures details about the land in question, the nature of the restriction (prohibition or conditional entry), and the specific conditions or prohibitions that need to be enforced.

Risk Radar

  • The most common mistake is not clearly defining the exact boundaries of the land covered by the order.
  • Incorrectly defined land boundaries making the order unenforceable
  • Overly broad restrictions that may face legal challenges
  • Failure to properly notify affected parties
  • Missing required supporting documentation

Plain English

This form helps manage who can go onto land that's important for railway operations. It can either completely stop people from entering certain areas or set specific rules about how they can enter, like wearing safety gear or only at certain times.

Submission Date

  • Not confirmed in official source. There may be specific timeframes for submitting this form related to railway projects or safety concerns. Contact the Courts Service for current deadline information.
  • Preparation window: collect IDs, supporting records, and signatures in advance.
  • Final review: verify names, dates, and required fields before submission.

AI Assistant

Get field-by-field guidance, auto-fill suggestions, and error detection.

Try it now ->

Glossary Terms

Hover a term to preview the meaning.

What this form is for

  • Use this form when you need to completely prohibit entry onto land for railway infrastructure purposes
  • Use this form when you need to specify conditions under which entry is permitted on railway-related land
  • Use this form for land access issues specifically related to railway infrastructure
  • Do not use this form for general trespass issues unrelated to railway operations
  • Consider other forms if the issue involves railway safety but doesn't require formal access restrictions

Use this form or another form?

SituationLikely formWhy it mattersCheck before you continue
General trespass issueForm 10A (Summons for Trespass)Different legal process for basic trespass casesCheck if the issue is specifically railway-related
Safety concerns on railway propertyForm 90A.1 (Safety Order)Focuses specifically on safety rather than access controlVerify if your concern is about access or safety hazards
Property boundary disputesCivil Court formsDifferent legal process for resolving property boundariesCheck if the issue is about access restrictions or property ownership
Railway worker access issuesEmployment contracts or internal company policiesDifferent process for workplace access rightsConfirm if this is about public access or employee access

Deadline or filing window

Not confirmed in official source. There may be specific timeframes for submitting this form related to railway projects or safety concerns. Contact the Courts Service for current deadline information.

Before you submit

  • All land boundaries are clearly defined with reference points or maps
  • The exact nature of the restriction (prohibition or conditions) is specified
  • All required parties are properly identified
  • Supporting evidence is included to justify the restriction
  • The form is signed by the authorized person
  • The correct court or authority is identified for submission
  • Any required fees are paid
  • A copy is kept for personal records

How to file this form

  1. 1Obtain the official Form 90A.2 from the Courts Service website or office
  2. 2Complete all sections with accurate details about the land and restrictions
  3. 3Prepare supporting documentation showing the necessity of the restrictions
  4. 4Submit the completed form to the appropriate court or authority
  5. 5Pay any required filing fees
  6. 6Serve notice to affected parties as required by law
  7. 7Attend any required court hearings

Known limitations

  • This form is specifically for railway infrastructure-related land access issues
  • The order may not be enforceable if boundaries are not clearly defined
  • The restrictions must be proportionate to the railway operational needs
  • Existing rights of way or easements may affect the enforceability
  • The form does not resolve underlying property ownership disputes

Almost done reviewing?

✦ Open in AI Editor

Current Form Status

Not confirmed in official source. This form appears to be current based on the Transport (Railway Infrastructure) Act, 2001, but users should verify the latest version with the Courts Service of Ireland.

Agency: Courts Service of Ireland

What changed or needs a fresh check

  • Verify the form number matches the latest version from the Courts Service
  • Check if any recent amendments to the Transport (Railway Infrastructure) Act affect this form
  • Confirm if electronic submission options are now available
  • Review if any additional supporting documentation is now required
  • Check if the processing timeframes have changed recently

Quick Facts

This form is typically submitted by railway infrastructure operators, landowners, or authorized representatives who need to regulate access to land for railway purposes.
The form captures details about the land in question, the nature of the restriction (prohibition or conditional entry), and the specific conditions or prohibitions that need to be enforced.
This form should be submitted when there is a need to establish or modify access restrictions to land that could affect railway infrastructure operations, safety, or maintenance activities.
Not confirmed in official source. Likely submitted through the Courts Service of Ireland or may need to be filed with the District Court in the relevant jurisdiction.
Submitting correctly ensures the order is legally enforceable and protects both railway operations and public safety. Errors could result in ineffective restrictions or legal challenges.
Complete the form with precise details about the location, boundaries, and nature of the restriction. Attach any supporting evidence or documentation about the necessity of the restriction. Submit to the appropriate court or authority as specified by the Courts Service.

Form Details

Agency
Courts Service of Ireland
Revision Date
02/11/25

90A.2 Order (Prohibiting Entry On Land) / (Specifying Conditions For Entry On Land) - Transport (Railway Infrastructure) Act, 2001

AI-powered guidance for every field

✦ Open in AI Editor

Free to start · No account required

After you file

  • Keep a copy of the submitted form and any court orders
  • Monitor compliance with the restrictions
  • Follow up with the court if acknowledgment is not received
  • Prepare for any potential legal challenges to the order
  • Update the order if railway infrastructure changes affect the restrictions
  • Renew the order before expiration if needed

Source and verification log

  • Form number: 90A.2
  • Issuing agency: Courts Service of Ireland
  • Related legislation: Transport (Railway Infrastructure) Act, 2001
  • Purpose: Regulating access to land for railway infrastructure
  • Not confirmed in official source: submission methods
  • Not confirmed in official source: current processing times
  • Not confirmed in official source: specific deadline requirements
  • Not confirmed in official source: fee amounts

Common confusion points

8 things to watch for

  • 1

    The difference between prohibiting entry and specifying conditions for entry

  • 2

    How to properly define land boundaries for enforcement purposes

  • 3

    Whether affected parties need to be notified before submission

  • 4

    The relationship between this form and railway safety regulations

  • 5

    Whether temporary or permanent restrictions should be specified

  • 6

    How to handle existing rights of access on the property

  • 7

    The role of railway infrastructure operators versus landowners

  • 8

    Whether legal representation is required for submission

Ready to get started?

Upload the form or open it in the AI Editor for intelligent guidance

✦ Open in AI Editor with guided fill

Related Guides & Resources

Term

Irish Form Affidavit of Attesting Witness (for minors aged 13 and under) - Affidavit of Attesting Witness (for minors aged 13 and under)

Irish COURTS form Affidavit of Attesting Witness (for minors aged 13 and under): Form for Affidavit of Attesting Witness (for minors aged 13 and under).

View →
Term

Irish Form Oath of Administrators with Will Annexed including Bond (De Bonis Non for Single Applicant) - Oath of Administrators with Will Annexed including Bond (De Bonis Non for Single Applicant)

Irish COURTS form Oath of Administrators with Will Annexed including Bond (De Bonis Non for Single Applicant): This is an oath sworn by a single administrator appointed to continue administering an estate when a previous executor or administrator has died or ceased to act (de bonis non), including a bond to guarantee proper administration..

View →
Term

Irish Form Oath of Administrators with Will Annexed including Bond for Single Applicant - Oath of Administrators with Will Annexed including Bond for Single Applicant

Irish COURTS form Oath of Administrators with Will Annexed including Bond for Single Applicant: This is an oath sworn by a single administrator appointed under a will (where no executor is acting), including a bond to guarantee proper administration of the estate..

View →
Term

Irish Form Probate Office Order Form - Probate Office Order Form

Irish COURTS form Probate Office Order Form: This is a form used to request certified copies of probate documents from the Probate Office.

View →

Source transparency

Copyright & Licensing — Irish Government Forms

Independent guide

BrieflyGo links to and explains official public form sources. We are not a government agency, and this page is for general form guidance, not legal advice.

CC BY 4.0Creative Commons Attribution 4.0 International. Free to copy, modify, and distribute — even commercially — with attribution.
Crown Copyright (AU)© Commonwealth of Australia. Material may be downloaded, displayed, printed and reproduced in unaltered form for personal non-commercial use or internal organisational use. Not under an open licence.
All Rights ReservedAll rights reserved by the copyright holder. Not licensed for open use. May only be used with explicit permission or under fair dealing/fair use.
All Rights ReservedAll rights reserved by the copyright holder. Not licensed for open use. May only be used with explicit permission or under fair dealing/fair use.
Verify current license terms with the source agency before reuse outside this platform.

Never sign without understanding every clause.

BrieflyGo reviews your contracts in plain English — instantly.

Try for free →